5 MW Chittaranjan Locomotive works (CLW)

This is a 5MW Project located at West Bengal and was done through Azure Power and there were various challenges due its high altitude and angle as Labour movement was very difficult. Lots of approvals required as there were safety issues.

Project Key Highlights


  • Project Size: 5 MW

  • Project Type: EPC Project

  • Project Developer: Azure Power

  • Project Location: West Bengal

4.1 MW JNV Project

This project is spreaded in all districts of UP (75 nos of sites ranging from 10kW to 120 kW)and karnataka ( 12 nos of sites ranging from 10kW to 100 kw)Several challenges were there such as approvals,material handling,manpower handling and deliverables in two months.

Project Key Highlights


  • Project Size:  4.1 MW

  • Project Type: EPC Project

  • Project Developer:  Azure Power

  • Project Location:  UP & Karnataka
Suntrap Solar poer (7)
Suntrap Solar poer (6)


4.6 MW SECI Project

This project in different prominent colleges and government offices such as IARI PUSA in Delhi.
Several challenges were there such as government approvals for net metering and CIEG, material handling, manpower handling and deliverables in two months.

Project Key Highlights


  • Project Size: 4.6 MW

  • Project Type: EPC Project

  • Project Developer: SECI Project

  • Project Location: Delhi, Chandigarh, UP & Rajasthan
WhatsApp Image 2024-05-12 at 3.04.05 AM
Suntrap (5)
Suntrap (2)
Suntrap Solar poer (10)
Suntrap solar panel (14)
WhatsApp Image 2024-05-12 at 3.12.57 AM
WhatsApp Image 2024-05-12 at 3.12.58 AM


4.5 MW Jhansi Project

One of the biggest project of railway at that time

Several challenges while executing this projects:

The height of the shed was very high.
GI sheet was in rusted condition, So we had to paint before Structure installation.
Cabling work was very tough because the roof was in a zig zag manner.
Due to the railway track between cable route ,We had made a bridge for cable crossing.
Atmospheric temperature was very high,so the team does work in days as well in night.

Project Key Highlights


  • Project Size: 4.5 MW

  • Project Type: EPC Project

  • Project Developer: Azure Power

  • Project Location: Jhansi railway Station
Jhansi railway Station solar panel work by suntrap (3)
Jhansi railway Station solar panel work by suntrap (5)
Jhansi railway Station solar panel work by suntrap (6)
Jhansi railway Station solar panel work by suntrap (7)
Jhansi railway Station solar panel work by suntrap (9)
Jhansi railway Station solar panel work by suntrap (1)
Jhansi railway Station solar panel work by suntrap (2)


Suntrap Solar poer (1)
Suntrap Solar poer (13)


455 KW Indigrid Project

These two solar ground mount projects with BESS system of sizes 205kW & 250kW at 11kV to meet the demands of the auxiliary consumptions of the substation.

Project Key Highlights


  • Project Size:  455 KW

  • Project Type: EPC Project

  • Project Developer:  Indigrid

  • Project Location:  Bhopal & Dhule

7.5MWp Renew Power Project

Project Key Highlights


  • Project Size:  7.5MWp

  • Project Type: EPC Project

  • Project Location:  Jaipur
renew Jaipur suntrap solar panel (5)-min
renew Jaipur suntrap solar panel (6)-min
renew Jaipur suntrap solar panel (7)-min
renew Jaipur suntrap solar panel-min
renew Jaipur suntrap solar panels-min
renew Jaipur suntrap solar panel (1)-min


Hero Future Energy
IPGCL 465 KW 2018 – 2019

This project is done through Hero Future Energy at KIT & Kalindi Institues.

Project Key Highlights


  • Project Size:  465 KW

  • Project Type: EPC Project

  • Project Developer & Location:  Hero Future Energy IPGC

RaysExperts 63 MW Solar Power Park Technical Audit and Performance Assessment

This project is an EPC of 2.5MW cumulative solar PV power plants along with its subsequent O&M work post commissioning. The solar PV power plants comprises of four 250KW project each at Aurangabad, Hyderabad, Rajmundary, Amravati and one 1.5MW power plant at Bawal, Haryana. The 250KW Aurangabad and Hyderabad projects have been commissioned in March 2016. The planned commissioning timelines for the remaining underway projects of Rajahmundry, Amravati is April 2016 and that of 1.5 MW Bawal solar PV power plant is May 2016.

Project Key Highlights


  • Project Size: 63 MW

  • Project Type: Technical Audit and Performance Assessment

  • Project Developer & Location: RaysExperts, Gajner, Rajasthan

  • Area Covered: 400 acres

  • Highlights: One of the India’s largest solar park.

Glimpses of Our O&M Project

42 MW Azure Power

There are multiple sites at Assam, Bihar, Chandigarh, J&K, HP , Jharkhand, Punjab and West  Bengal with different capacities.


  • Project Size: 42 MW

  • Project Type:  O&M

  • Project Developer: Azure Power

  • Project Location: Assam, Bihar, Chandigarh


21.5 MW
Radiance Renewables

There are multiple sites at Punjab, Haryana and West  Bengal with different capacities.

Project Key Highlights


  • Project Size: 21.5 MW

  • Project Type: O&M

  • Project Developer: Radiance Renewables

  • Project Location: Punjab, Haryana and West Bengal

22 MW Hero Future Energies

This project is interesting to handle in its own way. There are multiple  sites at Delhi, Gurgaon, Nagpur, Chandigarh, Jaipur, Rajasthan etc.


  • Project Size: 22 MW

  • Project Type: O&M

  • Project Developer: Hero Future Energies

  • Project Location: Delhi, Gurgaon, Nagpur.

8.8 MW Hartek Solar Pvt. Ltd.

This Project is located at MP with multiple sites.


  • Project Size: 8.8 MW

  • Project Type:  O&M

  • Project Developer: Hartek Solar Pvt. Ltd

  • Project Location: MP


576 KW Cleanmax Energy

This project includes sites at Jammu and Haryana.


  • Project Size: 576 KWp

  • Project Type: O&M

  • Project Developer: Cleanmax Energy 

  • Project Location: Jammu and Haryana.